BoardeX Exterior Sheathing Board (Glass Mat Faced - GM-H1-F)
Engineered exterior sheathing board with non-woven fiberglass mat facing and water-repellent core. Resists water, mold, and weathering up to 12 months unenclosed.
Turnkey project bill of materials engineered for commercial drywall contractors and fit-out specialists.
Carefully balanced items to maximize container space and fulfill job-site needs without dead stock.
| Included Material | Package Quantity | Weight / Function |
|---|---|---|
| COREX 12.5mm Plasterboard (Single or Double Layer) | 2.0 to 4.0 m² per m² of wall | Facing surfaces |
| Galvanized DC 50/75/100 Wall Studs (0.50mm / 0.60mm) | 2.0 Linear Meters per m² of wall | Vertical framing at 60cm centers |
| Galvanized DU 50/75/100 Runners (0.50mm / 0.60mm) | 0.7 Linear Meters per m² of wall | Perimeter floor/ceiling tracks |
| Acoustic PE Foam Sealing Tape (3mm x 50/75/100mm) | 0.7 Linear Meters per m² of wall | Acoustic flanking insulation |
| Drywall Screws 3.5 x 25mm / 35mm | 25 to 50 Pcs per m² of wall | Board mechanical fixing |
| DERZTEK Joint Compound (25kg bags) | 0.50 kg per m² of wall | Taping and screw head concealing |
| Fiberglass Mesh Joint Tape (48mm) | 1.5 Linear Meters per m² of wall | Joint seam reinforcement |
High-performance gypsum boards, galvanized profiles, and exterior sheathing direct from Turkish manufacturing plants.
Engineered exterior sheathing board with non-woven fiberglass mat facing and water-repellent core. Resists water, mold, and weathering up to 12 months unenclosed.
High-purity natural gypsum core encased in heavy ivory face paper. The industry standard board for interior partition walls, suspended ceilings, and drywall lining.
Vertical C-stud framing profiles engineered with knurled flanges for easy drywall screw driving and punch-outs for electrical cables and plumbing pipes.
Export procedures, technical standards, minimum orders, and shipping lead times.
Connect directly with our export sales engineering team on WhatsApp for instant container optimization, FOB/CIF pricing, and shipping schedules.